Solar Power Plants
From rooftops to open land, carports to farmland, we design, build and commission solar plants at every scale.
Permits, engineering, installation and operations: the whole process runs through a single partner.
A PV solution for every need

Rooftop PV
Solar systems built on the roofs of buildings of every kind, from homes to industrial plants. The energy generated is consumed on site first, and any surplus can be exported to the grid under the applicable regulations. The ideal solution for businesses looking to put existing roof area to work.

Ground-Mount PV
High-capacity solar plants built on suitable land. Chosen for self-consumption, for cutting energy costs, or for generation as an investment. Design, permitting and commissioning all call for expertise.

Agri-PV
Purpose-built systems that bring energy generation and farming together on the same land. They produce the energy irrigation needs while keeping the land in agricultural use, which makes them a sustainable choice for farming operations in particular.

Carport PV
Solar systems that turn car parks into structures which generate energy. They shelter vehicles and produce electricity at once, and can run alongside EV charging units to bring generation and consumption together in one place.
nZEB projects
Under Türkiye's building energy performance regulation, new buildings over 2,000 m² have had to be built as nearly zero energy buildings since 1 January 2025. At least 10% of the energy they consume must come from renewable sources, and their energy performance certificate must be class B or better.
Sizing the renewable share
We work the required share out from the building's own energy demand, then size the array to the roof and the land available.
Designed into the drawings
The system goes into the project at permit stage with the architectural and mechanical teams, planned together with the heat pump and storage.
Support through certification
We prepare the generation figures and technical documents the energy performance certificate needs, and carry out the site work ourselves.
Common questions
Who runs the permits and licensing?
We run every stage with our own team: the call-letter application, project approval, the connection agreement, acceptance and the system usage agreement.
How long does installation take?
It depends on the scope. On rooftop projects, survey to commissioning typically runs 16-20 weeks; on ground-mount projects the permit calendar can stretch it.
How much will a solar system cut my electricity bill?
The saving depends on your consumption profile, the system size and the installation type. We assess your generation and consumption data and put together a projection for your site.
Is my roof suitable for solar?
Orientation, pitch, load-bearing structure and shading all go into a suitability analysis. The free survey looks at your roof's potential in detail.
Does the system keep running during a power cut?
A standard solar system shuts down when the grid goes, for safety. A hybrid system built together with energy storage keeps feeding designated loads.
Can solar be added to an existing building?
In most cases, yes. Existing roofs are assessed structurally and a solar plant fitted afterwards.
How much maintenance does a solar system need?
Very little, as a PV system has no moving parts. Periodic checks and panel cleaning keep it performing for years.
Can storage or an EV charger be added to my existing system?
In many cases an existing solar system can be integrated with storage and EV charging. Suitability is assessed during the survey.